Stainless Steel CF8m 304 Cast Engine Auto Parts Door Lock Hardware

Basic InfoSurface: Satin/Mirror/PVD/PlatingCertificate: ISO9001, RoHS, CE , CUPCOEM/ODM: Available Delivery Port: GuangzhouDelivery Time: 30 to 50 daysDelivery Term: EXW,FOB,CIF,CFRProduct SpecificationInvestment Casting PartsMaterial: Stainless steel, Carbon SteelProcess: Lost wax castingStandard: GBT6414-1999Casting Toler

Featured Products

Basic Info
Surface: Satin/Mirror/PVD/Plating
Certificate: ISO9001, RoHS, CE , CUPC
OEM/ODM: Available
Delivery Port: Guangzhou
Delivery Time: 30 to 50 days
Delivery Term: EXW,FOB,CIF,CFR

Product Specification

Investment Casting Parts
Material: Stainless steel, Carbon Steel
Process: Lost wax casting
Standard: GBT6414-1999
Casting Tolerance: CT6 Standard
Weight: 0.1kg to 100kg
Product Range: Automotive, aviation, robot automation, machinery, tools, hardware, electronics, sanitary ware, pump valves, door locks and other stainless steel, carbon steel, alloy steel parts
Tooling made by ourself - We have 2 CNC centers
Complete machining process - We have our own machining, welding, polishing, testing workshops
 
Material Components

Chemical Composition of Material
Material
Composition
201202304316430
C≤0.15≤0.15≤0.08≤0.035≤0.12
Si≤1.00≤1.00≤1.00≤1.00≤1.00
Mn5.5-7.57.5-10≤2.00≤2.00≤1.00
P≤0.06≤0.06≤0.045≤0.045≤0.040
S≤0.03≤0.03≤0.030≤0.030≤0.030
Cr13-1514-1718-2016-1816-18
Ni0.7-1.13.5-4.58-1010-12 
Mo   2.0-3.0 

Mechanical Property
Material Item201202304316
Tensile Strength≥535≥520≥520≥520
Yield Strength≥245≥205≥205≥205
Extension≥30%≥30%≥35%≥35%
Hardness (HV)<105<100<90<90
Stainless Steel CF8m 304 Casting Engine Auto Spare Parts Door Locks Hardware
Stainless Steel CF8m 304 Casting Engine Auto Spare Parts Door Locks Hardware
 
Advantages
1, With our own stainless steel investment casting production lines and machining lines, give you one-stop services.
2, With CNC(CNC CENTER), we make the tooling by ourselves. Make you easier.
3, With 50000 square meters workshop located in Zhaoqing city, near Guangzhou port, transportation is convenient.
4, Use Germany Spectrometer and Salty Spray to test the raw material.
5, We have 15 engineers with strong ability to design and develop new products.
6, With ISO 9001:2015, ISO 14001 and OHSAS 18001 system.
7, With the ERP system, We can give you the production and delivery of information for the first time. Also if any quality problem, we can source it and give you the solution very fast.
8, Fast reply within 12 hours.
 
Company Introduction
ABL was founded in 2008 by Kate Liang, started from a 400 square meters workshop.
In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world.
In 2012, We have sold our products to more than 200 countries, and our brand existed
in more than 50 countries in the world.
In 2013, We have passed CUPC, NSF, CE and ROHS certificates,starting entered into the European and American markets.
In 2014, with the fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining types of equipment.
In 2015, We set up our management team. We have cooperated with some universities and getting bigger. At the same time, we are also Alibaba training center.
From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001certificate. we have already cooperated with some top 500 enterprises.
2018, ABL focus more on Lean Production and preparing for the next five years.
2019, We are going to build a testing center and achieve a higher sales goal.
 
Production Process
StepsTime
Tooling MakingCNC Center7 days


Casting Process
Wax Injection2 days
Sand Shell Molding5 days
Dewaxing1 days
Pouring1 days
Cutting1 days
Grinding1 days
Cleaning1 days


Machining Process
CNC2 days
Drilling & Tapping2 days
Welding2 days
Stamping1 days
Polishing5 days

Assembling
Ultrasonic Washing1 days
Water Testing1 days
Assembling2 days
Remark: The production time base on standard quantity and process
Our mission
To change the world's view about Chinese product.
To be the leader in the precision casting industry

Our dream
  1. To gain Win-win achievement with all of our clients and supplies
  2. To be an international famous brand.
  3. To be a one-hundred-year company
After-sales Service
  1. Reply you fast within 12 hours.
  2. Have someone to follow up all your inquiry and order.
  3. We will offer satisfied quality and prices to you.
FAQ
1, Where is your factory?
Our factory located in Zhaoqing City, Guangdong Province. Factory 50000 square meters with 265 workers.

2, What is your payment term?
We do T/T, 30% deposit, balance before delivery. We can also accept L/C.

3, What is the production time?
Casting part need 20 to 30 days.
Balustrade and handrail accessories need 25 to 35 days.
Faucet and shower need 40 to 60 days.

4, Is that possible to visit the factory?
Sure, we sincerely welcome you to visit our factory, we can also pick you from the hotel.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours